Industrial Estate, Leeds
Project Overview
Mobile CAD were instructed to deliver an internal measured survey for an industrial unit located at Leeds 27 Industrial Estate. The survey was required to support the M&E design phase ahead of the fit-out works. With tight scheduling constraints, the project demanded rapid mobilisation, precise data capture, and minimal disruption.
Challenges Faced
The client needed survey data urgently to avoid delays in the upcoming M&E design and construction programme.
Access to the unit had to be carefully timed during a narrow vacancy window, requiring flexibility and close communication with the client team.
With the clients request of M&E layouts, the team prioritised this data capture and had the QC manager check in real time.
The Outcome
Mobile CAD responded swiftly, deploying a team during a gap in occupancy to complete the measured survey with precision. By combining rapid mobilisation with robust on-site data collection, we ensured the client received high-quality, ready-to-use floor plans aligned with their project timeline.
Quick Turnaround
Accurate internal floor plans delivered within 48 hours of site visit.
Clear Communication
We are committed to providing project updates and transparency throughout the survey process to ensure all project requirements are met.
Data Accuracy
Fit-out designers able to progress work without delay or data revision.